NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
An Optimization Approach to Support Science Decision Making for Lunar Surface ExplorationIntroduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives.

The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives.

To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements.

Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning.

We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority.

Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination).

Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired.

Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03.

The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT.

Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change.

Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach.

Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.
Document ID
20240000165
Acquisition Source
Ames Research Center
Document Type
Presentation
Authors
Broddrick J T
(Ames Research Center Mountain View, United States)
Achilles C E
(Goddard Space Flight Center Greenbelt, United States)
Banks M E
(Goddard Space Flight Center Greenbelt, United States)
Charney D W
(Jacobs (United States) Dallas, Texas, United States)
Denevi B W
(Johns Hopkins University Applied Physics Laboratory North Laurel, United States)
Edgar L A
(United States Geological Survey Reston, United States)
Ewing R C
(Texas A&M University – Central Texas Killeen, United States)
Feist B F
(Jacobs (United States) Dallas, Texas, United States)
Garry W B
(Goddard Space Flight Center Greenbelt, United States)
Huff A E
(Arizona State University Tempe, United States)
Hurtado J M Jr
(The University of Texas at El Paso El Paso, United States)
Lanza N L
(Los Alamos National Laboratory Los Alamos, United States)
Miller M J
(Jacobs (United States) Dallas, Texas, United States)
Morse Z R
(Howard University Washington, United States)
Richardson J A
(Goddard Space Flight Center Greenbelt, United States)
Skinner J A, Jr
(United States Geological Survey Reston, United States)
Trainor C M
(Jacobs (United States) Dallas, Texas, United States)
Weitz C M
(Planetary Science Institute Tucson, Arizona, United States)
Young K E
(Goddard Space Flight Center Greenbelt, United States)
Date Acquired
January 4, 2024
Subject Category
Lunar and Planetary Science and Exploration
Meeting Information
Meeting: 55th Lunar and Planetary Science Conference (LPSC)
Location: The Woodlands, TX
Country: US
Start Date: March 11, 2024
End Date: March 15, 2024
Sponsors: Lunar and Planetary Institute, NASA Planetary Science
Funding Number(s)
WBS: 811073.02.43.01.14
Distribution Limits
Public
Copyright
Use by or on behalf of the US Gov. Permitted.
Technical Review
NASA Peer Committee
Keywords
Science Operations
Linear programming
lunar exploration
No Preview Available