NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Due to the lapse in federal government funding, NASA is not updating this website. We sincerely regret this inconvenience.

Back to Results
12-kW Advanced Electric Propulsion System Hall Current Thruster Qualification and Production StatusThe AEPS contract was awarded to AR in May of 2016 with the goal of developing a 12.5kW Hall Thruster System, including the Hall Current Thruster (HCT), Power Processor Unit (PPU) and Xenon Flow Controller (XFC). It was originally targeted to support the Asteroid Redirect Mission, which was cancelled early in the project. The project was subsequently restructured to support the Gateway PPE propulsion mission, with modified scope that consisted of the development, qualification and delivery of three 12kW flight thrusters. The PPU and XFC components were designed and development hardware fabricated with initial testing performed prior to being de-scoped from the contract. System level testing was performed by AR using these engineering components in early 2022 at the Aerospace Corporation’s EP-3 test facility.
Document ID
20240006249
Acquisition Source
Glenn Research Center
Document Type
Conference Paper
Authors
Rohit Shastry
(Glenn Research Center Cleveland, United States)
Hani Kamhawi
(Glenn Research Center Cleveland, United States)
Jason D. Frieman
(Glenn Research Center Cleveland, United States)
George C. Soulas
(Glenn Research Center Cleveland, United States)
Timothy G. Gray
(Glenn Research Center Cleveland, United States)
Timothy R. Verhey
(Glenn Research Center Cleveland, United States)
Clayton D. Kachele
(Glenn Research Center Cleveland, United States)
George J. Williams
(Glenn Research Center Cleveland, United States)
Nagual A. Simmons
(HX5, LLC)
Robert B. Lobbia
(Jet Propulsion Laboratory La Cañada Flintridge, United States)
Steven M. Arestie
(Jet Propulsion Laboratory La Cañada Flintridge, United States)
Vernon H. Chaplin
(Jet Propulsion Laboratory La Cañada Flintridge, United States)
Jack Fisher
(Aerojet Rocketdyne Rancho Cordova, California, United States)
Gabriella Blackner
(Aerojet Rocketdyne Rancho Cordova, California, United States)
Eleanor Forbes
(Aerojet Rocketdyne Rancho Cordova, California, United States)
Jack Hondagneu
(Aerojet Rocketdyne Rancho Cordova, California, United States)
Nicholas A. Branch
(Aerojet Rocketdyne Rancho Cordova, California, United States)
Jonathan M. Zubair
(Aerojet Rocketdyne Rancho Cordova, California, United States)
Hannah Watts
(Aerojet Rocketdyne Rancho Cordova, California, United States)
Date Acquired
May 15, 2024
Subject Category
Spacecraft Propulsion and Power
Report/Patent Number
IEPC-2024-298
Meeting Information
Meeting: 38th International Electric Propulsion Conference
Location: Toulouse
Country: FR
Start Date: June 23, 2024
End Date: June 28, 2024
Sponsors: Electric Rocket Propulsion Society
Funding Number(s)
WBS: 729200.01.03
CONTRACT_GRANT: NNC16CA21C
Distribution Limits
Public
Copyright
Use by or on behalf of the US Gov. Permitted.
Technical Review
Single Expert
Keywords
Hall thruster
electric propulsion
No Preview Available