Egress FitnessThe transition between gravity environments is one of the most complex, high-risk phases of exploration missions. The reduced functional capacity caused by physiological deconditioning and adaptations in microgravity coupled with the stressors of re-entry into gravity environments will increase the risk to crew, even with rigorous adherence to inflight countermeasures. Specifically, two high-risk scenarios may be required to be performed soon after gravity transitions: 1) nominal and/or emergency unassisted capsule egress task after return to Earth, and 2) planetary extravehicular activity (EVA) soon after landing on Mars or the Moon. Quantification of functional performance after exposure to extended durations in microgravity is necessary to inform concepts of operations and contingency scenarios for future exploration missions.
The overarching aim of this study is to quantify post-landing functional performance in crewmembers with physiological deconditioning after long-duration missions on the International Space Station (ISS). This study has two phases. Phase 1 includes a pilot study to assess the overall feasibility and demonstrate the capability to perform mission-like tasks shortly after landing from an ISS mission. Phase 2, the Egress Fitness study, which is part of the Complement of Integrated Protocols for Human Exploration Research (CIPHER), uses a task-based approach to characterize functional performance in long-duration ISS crewmembers before flight and shortly after return to Earth. The pilot and full Egress Fitness study includes pre-flight and post-flight testing of simulated emergency egress out of a functional capsule mockup and a high-fidelity Mars gravity EVA simulation at the Active Response Gravity Offload System (ARGOS) facility. The EVA simulation tasks include suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, traverse, geological sampling, alignment with a rear entry port, and suit egress (with the Pilot study including a subset of the EVA tasks). The post-flight simulated capsule egress test occurs 1–4 h after landing and the planetary EVA simulation occurs 18–36 h after landing. The full CIPHER Egress Fitness study included post-flight sessions on R+1, 4, and 8 to characterize the timeframe of recovery.
In 2025, four private astronauts on a 3.5-day commercial orbital mission completed capsule egress, both from their actual flight capsule and the capsule mockup. Results showed a greater change in time to completion for the actual capsule egress compared to the mockup capsule egress, indicating improved sensorimotor function in as little as three hours after landing.
CIPHER Egress Fitness has completed three subjects in full, 1 subject with capsule egress only and has 3 subjects currently in progress. This study will quantify post-landing functional performance in operationally relevant simulations to help inform fitness for duty standards and future planetary concepts of operations shortly after landing.
Document ID
20260002435
Acquisition Source
Johnson Space Center
Document Type
Presentation
Authors
Jason Norcross (KBR (United States) Houston, United States)
Taylor Schlotman (KBR (United States) Houston, United States)
Lauren Cox (JES Tech (United States) Houston, United States)
Richard Rhodes (Johnson Space Center Houston, United States)
Nicole Strock (KBR (United States) Houston, United States)
Millennia Young (Johnson Space Center Houston, United States)
Karina Marshall-Goebel (Johnson Space Center Houston, United States)
Date Acquired
March 23, 2026
Publication Date
April 7, 2026
Publication Information
Publisher: National Aeronautics and Space Administration
Subject Category
Aerospace Medicine
Meeting Information
Meeting: NASA Human Research Program Investigators’ Workshop (HRP IWS)
Location: Virtual
Country: US
Start Date: April 7, 2026
End Date: April 9, 2026
Sponsors: National Aeronautics and Space Administration