NASA Logo

NTRS

NTRS - NASA Technical Reports Server

The auto‑search feature has been disabled based on user feedback. Enter a search term/phrase and click “Search” to begin.

Back to Results
NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar MissionIn early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.
Document ID
20260004348
Acquisition Source
Marshall Space Flight Center
Document Type
Presentation
Authors
Bruce Askins
(Marshall Space Flight Center Redstone Arsenal, United States)
Date Acquired
May 14, 2026
Subject Category
Launch Vehicles and Launch Operations
Meeting Information
Meeting: 73rd JANNAF Propulsion Meeting
Location: Pittsburgh, PA
Country: US
Start Date: June 1, 2026
End Date: June 4, 2026
Sponsors: Joint Army-Navy-NASA-Air Force (JANNAF)
Funding Number(s)
CONTRACT_GRANT: 80KSC023CA006
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
Technical Review
Single Expert
No Preview Available