NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Raising TRL of Your Lunar PayloadPreparing payloads for the lunar surface requires rigorous testing that accurately captures the extreme environmental and operational conditions. This presentation provides an overview of the lunar relevant test capabilities at NASA JSC’s Astromaterials Research and Exploration Science (ARES) laboratories as well as the Energy System Test Area (ESTA) Lunar Development and Test Facility. These facilities allow teams to assess hardware performance in dusty vacuum environments, characterize interactions with high fidelity lunar regolith simulants, evaluate mechanical and thermal durability, and understand the effects of micrometeoroid and orbital debris impacts—critical factors for certifying payloads that will operate on the lunar surface or in orbit.

While Lunar power challenges such as variable illumination, extreme temperatures, and dust driven degradation will be briefly summarized, the focus of this talk is on how JSC’s test infrastructure enables developers to validate designs, reduce mission risk, and ensure compatibility with CLPS and Artemis objectives. NASA JSC’s expertise and experience help industry, academic, and government teams prepare robust hardware ready for successful delivery and operation on the surface of the Moon.
Document ID
20260004936
Acquisition Source
Johnson Space Center
Document Type
Presentation
Authors
Anastasia Ford
(Johnson Space Center Houston, United States)
Jeremiah McNatt
(Glenn Research Center Cleveland, United States)
Date Acquired
June 1, 2026
Publication Date
June 7, 2026
Publication Information
Publisher: National Space Society
Subject Category
Ground Support Systems and Facilities (Space)
Meeting Information
Meeting: 44th Annual National Space Society (NSS) International Space Development Conference (ISDC)
Location: McLean, VA
Country: US
Start Date: June 4, 2026
End Date: June 7, 2026
Sponsors: National Space Society
Funding Number(s)
WBS: 540062.04.05.02.09
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
Technical Review
NASA Peer Committee
Keywords
Laboratories
Testing
Lunar Surface Science
Vacuum Chambers
Lunar Regolith Simulant
No Preview Available