NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Characteristic features of determining the labor input and estimated cost of the development and manufacture of equipmentThe difficulties in obtaining exact calculation data for the labor input and estimated cost are noted. The method of calculating the labor cost of the design work using the provisional normative indexes with respect to individual forms of operations is proposed. Values of certain coefficients recommended for use in the practical calculations of the labor input for the development of new scientific equipment for space research are presented.
Document ID
19740025864
Acquisition Source
Legacy CDMS
Document Type
Other
Authors
Kurmanaliyev, T. I.
(Joint Publications Research Service Arlington, VA, United States)
Breslavets, A. V.
(Joint Publications Research Service Arlington, VA, United States)
Date Acquired
August 7, 2013
Publication Date
September 1, 1974
Publication Information
Publication: Technol. for the Production of Space Equipment (NASA-TT-F-15766)
Subject Category
General
Accession Number
74N33977
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available