NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Space Shuttle 1976 into mainstream development - Program commitments on schedule to insure careful progressA progress report is given on various systems, noting conformity to schedule or changes in design. The Orbiter thermal protection system, the Space Shuttle main engine, the intertank for the structural test article (STA), thrust vector control systems, the Kennedy Space Center launch processing system, and Orbiters No. 1 and No. 2 are discussed.
Document ID
19760033746
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Malkin, M. S.
(NASA Office of Space Flight Washington, D.C., United States)
Date Acquired
August 8, 2013
Publication Date
January 1, 1976
Publication Information
Publication: Astronautics and Aeronautics
Volume: 14
Subject Category
Launch Vehicles And Space Vehicles
Accession Number
76A16712
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available