NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Unlimbering Viking's scoopA number of difficulties which were encountered in deploying the Viking 1 lander's surface-sampler arm are discussed. When the surface sampler jammed during its initial operation, the problem was studied with the aid of tests on a full-scale lander mock-up. It was found that the difficulty was caused by a boom latch pin which had failed to fall clear. The surface-sampler arm could subsequently be freed by modifying the original command sequence. Another difficulty could be overcome by a similar approach.
Document ID
19770027873
Acquisition Source
Legacy CDMS
Document Type
Reprint (Version printed in journal)
Authors
Spitzer, C. R.
(NASA Langley Research Center Hampton, Va., United States)
Date Acquired
August 8, 2013
Publication Date
October 1, 1976
Publication Information
Publication: IEEE Spectrum
Volume: 13
Subject Category
Lunar And Planetary Exploration
Accession Number
77A10725
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available