NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
High-acceleration cable deploymentPrototype high-acceleration umbilical-cable deployment allows electrical communication between above-ground instrumentation and ballistic projectile below surface. Cable deployment is made up of forebody and afterbody. Foreboy can be separated from afterbody by rocket, or they can be fired as unit at target that stops afterbody on impact (forebody would continue, deploying cable). Similar design could be used in study of sea ice and in other surface-penetration studies.
Document ID
19790000547
Acquisition Source
Legacy CDMS
Document Type
Other - NASA Tech Brief
Authors
Barns, C. E.
Canning, T. N.
Gin, B.
King, R. W.
Murphy, J. P.
Date Acquired
August 10, 2013
Publication Date
June 1, 1980
Publication Information
Publication: NASA Tech Briefs
Volume: 4
Issue: 4
ISSN: 0145-319X
Subject Category
Machinery
Report/Patent Number
ARC-11256
Accession Number
79B10547
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available