NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Skylab reuse study, reference data, part 1The accommodations provided by the airlock module and the orbital workshop were completely examined with the thought of total reactivation as an enhancement to the STS long duration missions. Each subsystem is described and a summary of subsystem performance during the Skylab missions is presented. End-of-mission status and the status of today for each subsystem is shown together with refurbishment/resupply requirements and refurb kit descriptions to restore Skylab to full operational capability. An inspection/refurbishment and operations plan for Skylab is included. The initial Shuttle-tended operational activity would provide a safe, effective phase of Skylab rehabilitation while simultaneously benefitting the Orbiter crew through the addition of private accommodations, off-duty recreation area, and physical conditioning equipment. This period would also permit exercising selected onboard experiments.
Document ID
19790011998
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 3, 2013
Publication Date
December 1, 1978
Subject Category
Launch Vehicles And Space Vehicles
Report/Patent Number
NASA-CR-161187
MDC-G7556-PT-1
Accession Number
79N20169
Funding Number(s)
CONTRACT_GRANT: NAS8-32917
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available