NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
An automated process sequence using preformed cell contacts and interconnects with a total cost of $0.64 per peak watt in 1986A process sequence is described which utilizes a preformed metal mesh electrostatically bonded to each cell to provide the front contact. Cells of 12 percent AM1 efficiency have been produced using this scheme. This method also permits access to both contacts on the cell from the back side. In addition, low cost cell interconnection is accomplished using a flexible 'printed circuit' sheet which is ultrasonically bonded to the cell contacts. The complete process sequence as well as automated equipment which also uses ion implantation and pulse annealing is described. The total cost for module fabrication is estimated at $0.64 per peak watt for a 30 MW/year plant.
Document ID
19820061465
Acquisition Source
Legacy CDMS
Document Type
Conference Proceedings
Authors
Armini, A. J.
(Spire Corp. Bedford, MA, United States)
Landis, G. A.
(Spire Corp. Bedford, MA, United States)
Younger, P. R.
(Spire Corp. Bedford, MA, United States)
Date Acquired
August 10, 2013
Publication Date
January 1, 1981
Subject Category
Energy Production And Conversion
Meeting Information
Meeting: Photovoltaic Specialists Conference
Location: Kissimmee, FL
Start Date: May 12, 1981
End Date: May 15, 1981
Accession Number
82A45000
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available