NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Projecting manpower to attain qualityThe resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.
Document ID
19840015080
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Rone, K. Y.
(IBM Federal Systems Div. Houston, TX, United States)
Date Acquired
August 12, 2013
Publication Date
November 30, 1983
Publication Information
Publication: NASA. Goddard Space Flight Center Proc. of the Eighth Ann. Software Eng. Workshop
Subject Category
Computer Programming And Software
Accession Number
84N23148
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available