NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Berthing mechanism final test report and program assessmentThe purpose is to document the testing performed on both hardware and software developed under the Space Station Berthing Mechanisms Program. Testing of the mechanism occurred at three locations. Several system components, e.g., actuators and computer systems, were functionally tested before assembly. A series of post assembly tests were performed. The post assembly tests, as well as the dynamic testing of the mechanism, are presented.
Document ID
19890009146
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 5, 2013
Publication Date
October 1, 1988
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
CDRL-14
MDC-H3913
NASA-CR-183554
CDRL-13
NAS 1.26:183554
Report Number: CDRL-14
Report Number: MDC-H3913
Report Number: NASA-CR-183554
Report Number: CDRL-13
Report Number: NAS 1.26:183554
Accession Number
89N18517
Funding Number(s)
CONTRACT_GRANT: NAS8-36417
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available