NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Construction operations for an early lunar baseSix construction tasks identified as activities likely to be performed at an early lunar base are described: initializing the habitation module, preparing a landing site, transferring payload off the lander, smoothing roads, constructing the inflatable structure, and excavating for lunar oxygen production. Requirements for each task are given, and a point design capable of meeting the task requirements is described. EVA needs are listed for each task. The equipment used to perform these tasks is described. It is noted that all the tasks can be performed with three common vehicles (a rover, a truck, and an excavator) and some shared equipment.
Document ID
19890058369
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Graf, John
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
August 14, 2013
Publication Date
January 1, 1988
Subject Category
Ground Support Systems And Facilities (Space)
Meeting Information
Meeting: Space 88 Conference on Engineering, Construction, and Operations in Space
Location: Albuquerque, NM
Country: United States
Start Date: August 29, 1988
End Date: August 31, 1988
Accession Number
89A45740
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available