NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Implementation of a virtual link between power system testbeds at Marshall Spaceflight Center and Lewis Research CenterThe Marshall Space Flight Center (MSFC) owns and operates a space station module power management and distribution (SSM-PMAD) testbed. This system, managed by expert systems, is used to analyze and develop power system automation techniques for Space Station Freedom. The Lewis Research Center (LeRC), Cleveland, Ohio, has developed and implemented a space station electrical power system (EPS) testbed. This system and its power management controller are representative of the overall Space Station Freedom power system. A virtual link is being implemented between the testbeds at MSFC and LeRC. This link would enable configuration of SSM-PMAD as a load center for the EPS testbed at LeRC. This connection will add to the versatility of both systems, and provide an environment of enhanced realism for operation of both testbeds.
Document ID
19910053348
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Doreswamy, Rajiv
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 15, 2013
Publication Date
January 1, 1990
Subject Category
Ground Support Systems And Facilities (Space)
Meeting Information
Meeting: Intersociety Energy Conversion Engineering Conference
Location: Reno, NV
Country: United States
Start Date: August 12, 1990
End Date: August 17, 1990
Accession Number
91A37971
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available