NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
The SSM/PMAD automated test bed projectThe Space Station Module/Power Management and Distribution (SSM/PMAD) autonomous subsystem project was initiated in 1984. The project's goal has been to design and develop an autonomous, user-supportive PMAD test bed simulating the SSF Hab/Lab module(s). An eighteen kilowatt SSM/PMAD test bed model with a high degree of automated operation has been developed. This advanced automation test bed contains three expert/knowledge based systems that interact with one another and with other more conventional software residing in up to eight distributed 386-based microcomputers to perform the necessary tasks of real-time and near real-time load scheduling, dynamic load prioritizing, and fault detection, isolation, and recovery (FDIR).
Document ID
19920008555
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Lollar, Louis F.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
September 6, 2013
Publication Date
September 1, 1991
Publication Information
Publication: NASA, Washington, Beyond the Baseline 1991: Proceedings of the Space Station Evolution Symposium. Volume 2: Space Station Freedom, Part 1
Subject Category
Spacecraft Propulsion And Power
Accession Number
92N17774
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available