NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Power systems for the Mars Environmental Survey (MESUR) MissionMars Environmental Survey Mission (MESUR) is intended to be a low cost, near term mission to study the chemical composition of Martian surface, structure and circulation of Mars' atmosphere, and the structure and dynamics of Mars' interior. To meet the science objectives of the mission, a network of 16 landers will be placed at various latitudes and longitudes of Mars. The paper identifies various options for powering the landers and lists the attributes of each option. The current strategy is to precede the lander launch and deployment with an engineering demo mission called the Pathfinder which would demonstrate the landing strategy and the engineering subsystems. The paper briefly describes the challenges involved in the power system development for the Pathfinder mission.
Document ID
19930041904
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Shirbacheh, Mike
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Chmielewski, Art B.
(JPL Pasadena, CA, United States)
Date Acquired
August 16, 2013
Publication Date
January 1, 1992
Publication Information
Publication: In: IECEC '92; Proceedings of the 27th Intersociety Energy Conversion Engineering Conference, San Diego, CA, Aug. 3-7, 1992. Vol. 1 (A93-25851 09-44)
Publisher: Society of Automotive Engineers, Inc.
Subject Category
Spacecraft Propulsion And Power
Accession Number
93A25901
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available