NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
STS-81 Flight Day 4On this fourth day of the STS-81 mission, the flight crew, Cmdr. Michael A. Baker, Pilot Brent W. Jett, Mission Specialists, John M. Grunsfeld, Marsha S. Ivins, Peter J.K. Wisoff, and Jerry M. Linenger, prepare for the fifth linkup of the Space Shuttle and the Mir Space Station. The Atlantis docks with Mir at a point 210 nautical miles above the Earth southeast of Moscow, culminating a three-day rendezvous. Two hours after docking, the hatches between Atlantis and Mir are opened and Baker and Mir 22 Commander Valery Korzun share a hug to mark the start of five days of joint operations between the two crews. After an informal welcoming ceremony in the Mir's core module, the STS-81 crewmembers receive a station safety briefing. Linenger becomes the fourth American to occupy a position on the Russian Space Station following the docking of Atlantis to the outpost. During the docked phase of the mission, the two crews transfer nearly three tons of food, water and supplies to Mir.
Document ID
19970012098
Acquisition Source
Johnson Space Center
Document Type
Video
External Source(s)
Date Acquired
August 17, 2013
Publication Date
January 15, 1997
Subject Category
Space Transportation
Report/Patent Number
NASA-TM-112419
BRF-1493D
NONP-NASA-VT-97-1997021181
Accession Number
97N16725
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available