NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Research, planning, design and development of selected components, subsystems and systems for the Students for the Exploration and Development of Space Satellite (SEDSAT)The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the SEDSAT satellite to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The SEASIS instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was cancelled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.
Document ID
19970012952
Acquisition Source
Marshall Space Flight Center
Document Type
Contractor Report (CR)
Authors
Wingo, Dennis
(Alabama Univ. Huntsville, AL United States)
Date Acquired
September 6, 2013
Publication Date
March 13, 1997
Subject Category
Spacecraft Design, Testing And Performance
Report/Patent Number
NAS 1.26:203847
NASA-CR-203847
Accession Number
97N17071
Funding Number(s)
CONTRACT_GRANT: NAS8-38609
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available