NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
STS-88 Crew Interview: Jerry RossJerry Ross discusses the seven-day mission that will be highlighted by the mating of the U.S.-built Node 1 station element to the Functional Energy Block (FGB) which will already be in orbit, and two spacewalks to connect power and data transmission cables between the Node and the FGB. Node 1 will be the first Space Station hardware delivered by the Space Shuttle. He also disscusses the assembly sequence. The crew will conduct a series of rendezvous maneuvers similar to those conducted on other Shuttle missions to reach the orbiting FGB. Once the two elements are docked, Ross and Newman will conduct two scheduled spacewalks to connect power and data cables between the Node, PMAs and the FGB. The day following the spacewalks, Endeavour will undock from the two components, completing the first Space Station assembly mission.
Document ID
19990025630
Acquisition Source
Johnson Space Center
Document Type
Video
Date Acquired
August 19, 2013
Publication Date
December 17, 1998
Subject Category
Space Transportation
Report/Patent Number
JSC-1748C
NONP-NASA-VT-1999011625
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available