NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Space Solar Power Technical Interchange Meeting 2: SSP TIM 2The 2nd Space Solar Power Technical Interchange Meeting (SSP TIM 2) was conducted September 21st through 24th with the first part consisting of a Plenary session. The summary results of this Plenary session are contained in part one of this report. The attendees were then organized into Working Breakout Sessions and Integrated Product Team (IPT) Sessions for the purpose of conducting in-depth discussions in specific topic areas and developing a consensus as to appropriate study plans and actions to be taken. The Second part covers the Plenary Summary Session, which contains the summary results of the Working Breakout Sessions and IPT Sessions. The appendix contains the list of attendees. The ob'jective was to provide an update for the study teams and develop plans for subsequent study activities. This SSP TIM 2 was initiated and the results reported electronically over the Internet. The International Space Station (ISS) could provide the following opportunities for conducting research and technology (R&T) which are applicable to SSP: (1) Automation and Robotics, (2) Advanced Power Generation, (3) Advanced Power Management & Distribution (PMAD), (4) Communications Systems and Networks, (5) Energy Storage, (6) In Space Propulsion (ISP), (7) Structural Dynamics and Control, and Assembly and (8) Wireless Power Transmission.
Document ID
19990110663
Acquisition Source
Marshall Space Flight Center
Document Type
Other
Authors
Sanders, Jim
(Alabama Univ. Huntsville, AL United States)
Hawk, Clark W.
(Alabama Univ. Huntsville, AL United States)
Date Acquired
September 6, 2013
Publication Date
December 22, 1998
Subject Category
Spacecraft Propulsion And Power
Funding Number(s)
CONTRACT_GRANT: NASA Order H-30192-D
CONTRACT_GRANT: NAS8-97095
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available