NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Methodology for Evaluating Raw Material Changes to RSRM Elastomeric Insulation MaterialsThe Reusable Solid Rocket Motor (RSRM) uses asbestos and silicon dioxide filled acrylonitrile butadiene rubber (AS-NBR) as the primary internal insulation to protect the case from heat. During the course of the RSRM Program, several changes have been made to the raw materials and processing of the AS-NBR elastomeric insulation material. These changes have been primarily caused by raw materials becoming obsolete. In addition, some process changes have been implemented that were deemed necessary to improve the quality and consistency of the AS-NBR insulation material. Each change has been evaluated using unique test efforts customized to determine the potential impacts of the specific raw material or process change. Following the evaluations, the various raw material and process changes were successfully implemented with no detectable effect on the performance of the AS-NBR insulation. This paper will discuss some of the raw material and process changes evaluated, the methodology used in designing the unique test plans, and the general evaluation results. A summary of the change history of RSRM AS-NBR internal insulation is also presented.
Document ID
20020018162
Acquisition Source
Marshall Space Flight Center
Document Type
Preprint (Draft being sent to journal)
Authors
Mildenhall, Scott D.
(Thiokol Propulsion Brigham City, UT United States)
McCool, Alex
Date Acquired
September 7, 2013
Publication Date
January 1, 2001
Subject Category
Nonmetallic Materials
Report/Patent Number
AIAA Paper 2001-3281
Meeting Information
Meeting: 37th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit
Location: Salt Lake City, UT
Country: United States
Start Date: July 8, 2001
End Date: July 11, 2001
Sponsors: American Society of Mechanical Engineers, Society of Automotive Engineers, Inc., American Inst. of Aeronautics and Astronautics, American Society for Electrical Engineers
Funding Number(s)
CONTRACT_GRANT: NAS8-38100
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available