NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
The Tunable XUV Imager (TXI) Sounding Rocket PayloadThe TXI was flown successfully on 21 June 2001 (36.199 US). All systems functioned as planned and image data were acquired and sent to the ground. Unfortunately, due to a parachute failure the payload was destroyed. In this report we summarize results from the flight and provide detailed information on the high resolution X-ray imaging detector which was developed as part of the program.
Document ID
20040084234
Acquisition Source
Goddard Space Flight Center
Document Type
Contractor or Grantee Report
Authors
Brinton, John
(NASA Wallops Flight Center Wallops Island, VA, United States)
Golub, Leon
(Smithsonian Astrophysical Observatory Cambridge, MA, United States)
Date Acquired
September 7, 2013
Publication Date
July 1, 2004
Subject Category
Solar Physics
Funding Number(s)
CONTRACT_GRANT: NAG5-5075
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available