NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
James Webb Space Telescope StatusThe James Webb Space Telescope (JWST) is the first deployable infrared to millimeter wave space telescopes. We will describe the progress on JWST and introduce other speakers in the session. The JWST will operate at the Sun-Earth Lagrange point L2, where radiative cooling lowers the telescope and instrument temperatures to about 35 K. It will have an 18-segment beryllium primary mirror with a 25 m2 area fitting inside a 6.6m circumscribed circle, and will provide spectroscopy and imaging over the wavelength range from 0.6 to 28 microns. It is planned for launch in 2011 on an Ariane 5 rocket. The project is a partnership of NASA, ESA, and CSA, and the prime contractor is Northrop Grumman. See http://www.jwst.nasa.gov for more details on JWST.
Document ID
20050131681
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Mather, John C.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 23, 2013
Publication Date
January 1, 2005
Subject Category
Instrumentation And Photography
Meeting Information
Meeting: American Astronomical Society Meeting
Location: San Diego, CA
Country: United States
Start Date: January 9, 2005
End Date: January 13, 2005
Sponsors: American Astronautical Society
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available