NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
First CutLockheed Martin and a Northrop Grumman/Boeing team expect the Crew Exploration Vehicle proposals they submitted last week to change, given the new top-down push at NASA to close the gap between space shuttle retirement and launch of the new crew carrier. Still, delivery of the proposals gives a first glimpse of at least one of the concepts for a space shuttle replacement. Instead of the ballistic capsule approach put forward in some early CEV concept work, Lockheed Martin proposed a lifting body shape with a two-stage thermal protection system, coupled with a cylindrical mission module to give crews of four to six extra room on trips to the Moon, and a trans-Earth injection module (TEIM) for the return powered-at least in the first cut-by a couple of Pratt & Whitney RL10 rocket engines.
Document ID
20050169217
Acquisition Source
Headquarters
Document Type
Reprint (Version printed in journal)
Authors
Morring, Frank, Jr.
(NASA Headquarters Washington, DC United States)
Date Acquired
August 23, 2013
Publication Date
May 9, 2005
Publication Information
Publication: Aviation Week and Space Technology
Volume: 162
Issue: 19
ISSN: 0005-2175
Subject Category
Economics And Cost Analysis
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available