STS-114: Post Launch MMT BriefingBill Parsons, Space Shuttle Program Manager, and Wayne Hill, Deputy Manager of the Space Shuttle Program, and Chair of the Mission Management Team talks about the flight day 2 of the Discovery. Bill noted that flight operations are extremely going on well. He also explained an unexpected debris event on a power ramp little ways down where LH2 ramp begins. Before flight and based from technical data, slight modifications were done on the power ramp to ensure safety of return to flight. Bill also noted that STS-114 is a test flight; all data collected and brought back by the crew will be analyzed to ensure that all information needed is sufficient to work on faults and defects and to make appropriate repairs. Wayne discussed on flight safety. He emphasized the need to thoroughly inspect the thermal protection system of the Orbiter to ensure safe entry. Inspection of still photographs from the ISS and the boom sensor system scan are the primary means to understand engineering data in terms of the immediate flight safety. He also reported accomplishments for the day such as survey of the Orbiter boom system, all the wing leading edge, RCC panels and the nose cap, to make sure these are in good shape and working well, and re-emphasized that these are primary methods to clear the thermal protection system of the Orbiter to prove that it is safe to come home on this flight.