NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
STS-114: Discovery Day 6 Post MMT MeetingWane Hill, Deputy Manager of the Space Shuttle Program, and Steve Poulos, Manager, Orbiter Project Office discussed damage assessments caused during ascent. Steve further detailed the damage analysis and assessments with chart presentation of composite tile damage and gap filler sites evaluation, protruding ceramic shim, left wing tile damage, comparisons of ground test results versus FD5 focused inspection, and the window 1 blanket. Gap fillers, the STS-73, thermal protection, temperature range, heating and heating range, aerodynamics, aerothermodynamics, risk, foam damage, tile adhesions, and extravehicular activities are topics covered with the News media.
Document ID
20050214686
Acquisition Source
Kennedy Space Center
Document Type
Video
Date Acquired
August 23, 2013
Publication Date
July 31, 2005
Subject Category
Space Transportation And Safety
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available