NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
STS-114: Discovery Mission Status BriefingPhil Engelauf, STS-114 Mission Operations Representative reports: the orbital rendezvous was successful, and today's activities includes initial preparations of the next day's extravehicular activities (EVA); he specifically mentioned tile repair, wiring on the outside of the vehicle to try to recover CMG2 (Control Moment Gyro), and preparation for the external stowage platform. John Shannon, Manager of the Space Shuttle Operations and Integration reports from Engineering standpoint that the composites of the underside of the tile surface seen from pictures taken during the pitch maneuver were extremely clean; the Engineering staff continues to look at the focus inspection data from the orbital boom sensor system (OBSS) and other data to assess the condition of the vehicle. Solid rocket boosters were retrieved and are towed back to the Air Force hangar in Cape Carneval. Six target inspection (nose gear doors, gap fillers, chine area, external tank doors, trailing edge, and ice), and arm operations, foam, conservation measures, shuttle air lock, aerodynamics assessment and re-entry were topics covered with the News media.
Document ID
20050214875
Acquisition Source
Kennedy Space Center
Document Type
Video
Date Acquired
August 23, 2013
Publication Date
July 29, 2005
Subject Category
Space Transportation And Safety
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available