Development Overview of the Revised NASA Ultra Long Duration BalloonThe development of the National Aeronautics and Space Administration s (NASA) Ultra Long Duration Balloon (ULDB) has made significant strides in addressing the deployment issues experienced in the scaling up of the balloon structure. This paper concentrates on the super-pressure balloon developments that have been, and are currently being planned by the NASA Balloon Program Office at Goddard Space Flight Center s Wallops Flight Facility. The goal of the NASA ULDB development project is to attempt to extend the potential flight durations for large scientific balloon payloads. A summary of the February 2005 test flight from Ft. Sumner, New Mexico will be presented. This test flight spurred a number of investigations and advancements for this project. The development path has pursued some new approaches in the design, analysis, and testing of the balloons. New issues have been ideEti6ed throu& both analysis md testing. These have been addressed in the design stage before the next balloon construction was begun. This paper will give an overview of the recent history for this effort and the development approach pursued for ULDB. A description of the balloon design, including the modifications made as a result of the lessons learned, will be presented. Areas to be presented include the design approach, deployment issues that have been encountered and the proposed solutions, ground testing, photogrammetry, and an analysis overview. Test flight planning and considerations will be presented including test flight safety. An extended duration test flight of the National Aeronautics and Space Administration s Ultra Long Duration Balloon is planned for the May/June 2006 time frame. This flight is expected to fly from Sweden to either Canada or Alaska. Preliminary results of this flight will be presented as available. Future plans for both ground testing and additional test flights will also be presented. Goals of the future test flights, which are staged in increments of increasing suspended load and altitude, will be presented. This will include the projected balloon volumes, payload capabilities, test flight locations, and proposed flight schedule.
Document ID
20060026317
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Cathey, H. M.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Gregory, D
(NASA Wallops Flight Facility Wallops Island, VA, United States)
Young, L.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Pierce, D.
(NASA Wallops Flight Facility Wallops Island, VA, United States)
Date Acquired
August 23, 2013
Publication Date
January 1, 2006
Subject Category
Aeronautics (General)
Meeting Information
Meeting: COSPAR
Location: Beijing
Country: China
Start Date: July 16, 2006
End Date: July 23, 2006
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available