NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Status of the extended life test of the Deep Space 1 flight spare ion engine after 30,352 hours of operationThe extended life test (ELT) of the Deep Space 1 (DS1) spare flight ion thruster (FT2) was voluntarily terminated June 26th 2003. The test was started in Cotober of 1998, just prior to the launch of the DS1 spacecraft, with the primary purpose of determining the ultimate service life capability of the NASA 30-cm-ion thruster technology.
Document ID
20060043359
Acquisition Source
Jet Propulsion Laboratory
Document Type
Conference Paper
External Source(s)
Authors
Sengupta, Anita
Brophy, John R.
Goodfellow, Keith D.
Date Acquired
August 23, 2013
Publication Date
July 1, 2003
Subject Category
Spacecraft Propulsion And Power
Meeting Information
Meeting: Joint Propulsion Conference
Location: Huntsville, AL
Country: United States
Start Date: July 20, 2003
End Date: July 23, 2003
Distribution Limits
Public
Copyright
Other
Keywords
Deep Space 1
DS1
ion engine

Available Downloads

There are no available downloads for this record.
No Preview Available