NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Managing Risk to Ensure a Successful Cassini/Huygens Saturn Orbit Insertion (SOI)I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.
Document ID
20090020285
Acquisition Source
Jet Propulsion Laboratory
Document Type
Conference Paper
External Source(s)
Authors
Witkowski, Mona M.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Huh, Shin M.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Burt, John B.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Webster, Julie L.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 24, 2013
Publication Date
May 19, 2004
Subject Category
Space Transportation And Safety
Meeting Information
Meeting: SpaceOps Conference
Location: Montreal
Country: Canada
Start Date: May 17, 2004
End Date: May 21, 2004
Distribution Limits
Public
Copyright
Other
Keywords
risk managment
risk assessment

Available Downloads

There are no available downloads for this record.
No Preview Available