NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Ares V: Shifting the Payload Design ParadigmNASA's Ares V heavy-lift cargo launch vehicle is being designed send more crew and cargo to more places on the lunar surface than the 1960s-era Apollo program and provide ongoing support to a permanent lunar outpost. In addition to that role, however, its unmatched mass and volume capability represent a global asset for exploration, science, and commerce. The Ares V also is an enabler of a large class of space missions not thought possible by scientists and engineers since the Saturn V program ended over 30 years ago. Compared to current systems, it will offer approximately 5 times the mass and volume to most orbits and locations. This should allow prospective mission planners to build robust payloads with margins that are 3 to 5 times the industry norm. The space inside the planned payload shroud has enough usable volume to launch the volumetric equivalent of approximately 10 Apollo Lunar Excursion Modules or approximately 5 equivalent Hubble Space Telescopes. This mass and volume capability to Low Earth Orbit enables a host of new scientific and observation platforms, such as telescopes, satellites, planetary and solar missions, as well as being able to provide the lift for future large in-space infrastructure missions, such as space based power and mining, Earth asteroid defense, propellant depots, etc. The Ares V team is engaging the potential payload community now, 2-3 years before System Requirements Review, in order to better understand the potential limitations and or additional requirements that could be added to the Ares V from the mission planning community. If a viable mission is determined and added to the Ares V as a design case, tradeoffs will be conducted to determine if other mission design requirements can be included in the system. Multiple shroud options for the Ares V have been analyzed to identify their impact on performance. Ares V is in a conceptual design stage prior to a formal design phase. The initial concept for the cargo launch vehicle (CaLV) that would later be dubbed "Ares V" was produced by the Exploration Systems Architecture Study in 2005. Since then, it has evolved through hundreds of concepts. The current point-of-departure (POD) concept was approved during the Lunar Capabilities Concept Review/Ares V Mission Concept Review in June 2008. This reference concept serves as a starting point for a renewed set of design trades and detailed analysis into its interaction with the other components of the Constellation architecture and existing launch infrastructure. This paper will discuss the Ares V design evolution, the most recent point-of-departure concept, and its capabilities to support future science missions.
Document ID
20090042878
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Summrall, Phil
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Creech, Steve
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
August 24, 2013
Publication Date
October 12, 2009
Subject Category
Launch Vehicles And Launch Operations
Report/Patent Number
M09-0333
Meeting Information
Meeting: 60th International Astronautical Congress
Location: Daejeon
Country: Korea, Republic of
Start Date: October 12, 2009
End Date: October 16, 2009
Sponsors: International Astronautical Federation
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.

Available Downloads

There are no available downloads for this record.
No Preview Available