NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
A Statistical Project Control Tool for Engineering ManagersThis slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.
Document ID
20100036240
Acquisition Source
Johnson Space Center
Document Type
Presentation
Authors
Bauch, Garland T.
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
August 25, 2013
Publication Date
August 16, 2001
Subject Category
Engineering (General)
Report/Patent Number
JSC-CN-7051
Meeting Information
Meeting: 2nd International Workshop on Engineering Management for Applied Technology
Location: Austin, TX
Country: United States
Start Date: August 16, 2001
Sponsors: Texas Univ.
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available