NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office SupportThis paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.
Document ID
20120003519
Document Type
Conference Paper
Authors
Cornelius, David (Analytical Mechanics Associates, Inc. Hampton, VA, United States)
Sasamoto, Washito (NASA Langley Research Center Hampton, VA, United States)
Daugherty, Kevin (NASA Langley Research Center Hampton, VA, United States)
Deacon, Shaun (Analytical Mechanics Associates, Inc. Hampton, VA, United States)
Date Acquired
August 25, 2013
Publication Date
March 3, 2012
Subject Category
Economics and Cost Analysis
Report/Patent Number
NF1676L-13354
Meeting Information
2012 IEEE Aerospace Conference(Big Sky, MT)
Funding Number(s)
WBS: WBS 304029.01.03
Distribution Limits
Public
Copyright
Other