NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Re-Engineering the Mission Operations System (MOS) for the Prime and Extended MissionOne of the most challenging tasks in a space science mission is designing the Mission Operations System (MOS). Whereas the focus of the project is getting the spacecraft built and tested for launch, the mission operations engineers must build a system to carry out the science objectives. The completed MOS design is then formally assessed in the many reviews. Once a mission has completed the reviews, the Mission Operation System (MOS) design has been validated to the Functional Requirements and is ready for operations. The design was built based on heritage processes, new technology, and lessons learned from past experience. Furthermore, our operational concepts must be properly mapped to the mission design and science objectives. However, during the course of implementing the science objective in the operations phase after launch, the MOS experiences an evolutional change to adapt for actual performance characteristics. This drives the re-engineering of the MOS, because the MOS includes the flight and ground segments. Using the Spitzer mission as an example we demonstrate how the MOS design evolved for both the prime and extended mission to enhance the overall efficiency for science return. In our re-engineering process, we ensured that no requirements were violated or mission objectives compromised. In most cases, optimized performance across the MOS, including gains in science return as well as savings in the budget profile was achieved. Finally, we suggest a need to better categorize the Operations Phase (Phase E) in the NASA Life-Cycle Phases of Formulation and Implementation
Document ID
20130009125
Acquisition Source
Jet Propulsion Laboratory
Document Type
Conference Paper
External Source(s)
Authors
Hunt, Joseph C., Jr.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Cheng, Leo Y.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 27, 2013
Publication Date
June 11, 2012
Subject Category
Lunar And Planetary Science And Exploration
Meeting Information
Meeting: SpaceOps 2012
Location: Stockholm
Country: Sweden
Start Date: June 11, 2012
End Date: June 15, 2012
Distribution Limits
Public
Copyright
Other
Keywords
Extended Mission
Prime Mission
Spitzer
Re-Engineering
Mission Operations System

Available Downloads

There are no available downloads for this record.
No Preview Available