NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Spacecraft Power Source Installation at Launch ComplexFor certain space missions, an assembly must be integrated onto the spacecraft as late as possible in the launch vehicle processing flow. 12This late integration can be driven for a variety of reasons including thermal or hazardous materials constraints. This paper discusses the process of integrating an assembly onto a spacecraft as late as one week prior to the opening of the launch window. Consideration is given to achieving sufficient access for hardware integration, methods of remotely securing hardware to the spacecraft, maintaining spacecraft cleanliness throughout the integration process, and electrically integrating the component to the spacecraft. Specific examples are taken from the remote mechanical, electrical, and fluid cooling system integration of the power source onto the Mars Science Laboratory (MSL) Rover at the Atlas V Vertical Integration Facility (VIF) at Cape Canaveral Air Force Station, Florida.
Document ID
20150011972
Acquisition Source
Jet Propulsion Laboratory
Document Type
Conference Paper
External Source(s)
Authors
Lytal, Paul
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Hoffman, Pamela
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
July 1, 2015
Publication Date
March 6, 2010
Subject Category
Ground Support Systems And Facilities (Space)
Meeting Information
Meeting: 2010 IEEE Aerospace Conference
Location: Big Sky,MT
Country: United States
Start Date: March 6, 2010
End Date: March 13, 2010
Sponsors: Institute of Electrical and Electronics Engineers
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available