NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Preparing Cassini Uplink Operations for Extended MissionThe Cassini-Huygens Mission to Saturn and Titan, a joint venture between the National Aeronautics and Space Administration, the European Space Agency, and the Italian Space Agency, is conducting a four-year, prime mission exploring the Saturnian system, including its atmosphere, rings, magnetosphere, moons and icy satellites. Launched in 1997, Cassini began its prime mission in 2004. Cassini is now preparing for a new era, a two-year extended mission to revisit many of the highlights and new discoveries made during the prime mission. Because of the light time delay from Earth to Saturn, and the time needed to coordinate the complicated science and engineering activities that take place on the spacecraft, commanding on Cassini is done in approximately 40-day intervals known as sequences. The Cassini Uplink Operations team is responsible for the final development and validation of the pointing profile and instrument and spacecraft commands that are contained in a sequence. During this final analysis prior to uplink to the spacecraft, thorough and exact evaluation is necessary to ensure there are no mistakes during commanding. In order to perform this evaluation, complete and refined processes and procedures are fundamental. The Uplink Operations team is also responsible for anomaly response during sequence execution, a process in which critical decisions often are made in real-time. Recent anomalies on other spacecraft missions have highlighted two major risks in the operations process: (1) personnel turnover and the retirement of critical knowledge and (2) aging, outdated operations procedures. If other missions are a good barometer, the Cassini extended mission will be presented with a high personnel turnover of the Cassini flight team, which could lead to a loss of expertise that has been essential to the success of the prime mission. In order to prepare the Cassini Uplink Operations Team for this possibility and to continue to develop and operate safe science and engineering sequences, a review and major update of the current documentation and operations procedures was needed. This paper will address the changes made to extended mission sequence generation processes primarily due to new restrictions in spacecraft operating capability and lessons learned from prime mission. In addition, it will address the state of the prime mission operations procedures, the philosophy changes and updates that were made to those procedures in response to process improvement, and the validation of those new procedures through the training of current and new personnel. And lastly, it will address the lessons learned throughout prime mission and how the Uplink Operations team chose to incorporate those lessons into the working documentation and team knowledge. This incorporation was necessary to facilitate the success of the extended mission with potentially all new personnel at some point prior to the end of the mission.
Document ID
20150014745
Acquisition Source
Jet Propulsion Laboratory
Document Type
Conference Paper
External Source(s)
Authors
Maxwell, Jennifer L.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
McCullar, Michelle L.
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Conner, Diane
(Jet Propulsion Lab., California Inst. of Tech. Pasadena, CA, United States)
Date Acquired
August 3, 2015
Publication Date
May 12, 2008
Subject Category
Astronautics (General)
Meeting Information
Meeting: SpaceOps 2008
Location: Heidelberg
Country: Germany
Start Date: May 12, 2008
End Date: May 16, 2008
Sponsors: American Inst. of Aeronautics and Astronautics
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available