NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Current Science Requirements and Planned Implementation for the WFIRST-CGI Integral Field Spectrograph (IFS)One of the key science goals of the Coronograph Instrument (CGI) on the WFIRST mission is to spectrally characterize the atmospheres of planets around other stars at extremely high contrast levels. To achieve this goal, the CGI Instrument will include a integral field spectrograph (IFS) as one of the two science cameras. We present the current science requirements that pertain to the IFS design, describe how our design implementation flows from these requirements, and outline our current instrument design.
Document ID
20180001950
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
External Source(s)
Authors
Mandell, Avi M.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Groff, Tyler D.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Gong, Qian
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Rizzo, Maxime J.
(Universities Space Research Association Greenbelt, MD, United States)
Lupu, Roxana
(Bay Area Environmental Research Inst. Moffett Field, CA, United States)
Zimmerman, Neil T.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Saxena, Prabal
(Universities Space Research Association Greenbelt, MD, United States)
McElwain, Michael W.
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
March 19, 2018
Publication Date
September 12, 2017
Publication Information
Publication: Techniques and Instrumentation for Detection of Exoplanets VIII
Publisher: SPIE
Volume: 10400
ISSN: 0277-786X
ISBN: 9.78E+12
Subject Category
Astronomy
Instrumentation And Photography
Report/Patent Number
GSFC-E-DAA-TN53791
Meeting Information
Meeting: SPIE Optical Engineering + Applications 2017
Location: San Diego, CA
Country: United States
Start Date: August 6, 2017
End Date: August 10, 2017
Sponsors: International Society for Optical Engineering
Funding Number(s)
CONTRACT_GRANT: NNH15CO48B
CONTRACT_GRANT: NNX16AO96A
Distribution Limits
Public
Copyright
Other

Available Downloads

There are no available downloads for this record.
No Preview Available