NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Exact and Heuristic Algorithms for Runway SchedulingThis paper explores the Single Runway Scheduling (SRS) problem with arrivals, departures, and crossing aircraft on the airport surface. Constraints for wake vortex separations, departure area navigation separations and departure time window restrictions are explicitly considered. The main objective of this research is to develop exact and heuristic based algorithms that can be used in real-time decision support tools for Air Traffic Control Tower (ATCT) controllers. The paper provides a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the SRS problem, but may prove unusable for application in real-time environment due to large computation times for moderate sized problems. We next propose a second algorithm that uses heuristics to restrict the search space for the DP based algorithm. A third algorithm based on a combination of insertion and local search (ILS) heuristics is then presented. Simulation conducted for the east side of Dallas/Fort Worth International Airport allows comparison of the three proposed algorithms and indicates that the ILS algorithm performs favorably in its ability to find efficient solutions and its computation times.
Document ID
20180002159
Acquisition Source
Ames Research Center
Document Type
Conference Paper
External Source(s)
Authors
Malik, Waqar A.
(California Univ. Santa Cruz, CA, United States)
Jung, Yoon C.
(NASA Ames Research Center Moffett Field, CA, United States)
Date Acquired
April 4, 2018
Publication Date
June 13, 2016
Subject Category
Air Transportation And Safety
Computer Programming And Software
Report/Patent Number
AIAA Paper 2016-4072
ARC-E-DAA-TN28000
Meeting Information
Meeting: AIAA Aviation Technology, Integration, and Operations Conference
Location: Washington, DC
Country: United States
Start Date: June 13, 2016
End Date: June 17, 2016
Sponsors: American Inst. of Aeronautics and Astronautics
Funding Number(s)
CONTRACT_GRANT: NAS2-03144
WBS: WBS 330693.04.20.01.02
Distribution Limits
Public
Copyright
Public Use Permitted.
Keywords
safe & surface operations
surface optimization
runway scheduling
No Preview Available