NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Overview of Power Quality and Integrated Testing at JSCThis presentation describes the basic philosophy behind integrated testing and partially integrated testing. It lists some well known errors in space systems that were or could have been caught during integrated testing. Two examples of integrated testing at the Johnson Space Center (JSC) are mentioned, and then an overview of two test facilities that do power testing (partially integrated testing) at JSC are presented, with information on the capabilities of each. Finally a list of three projects that has problems caught during power quality or Electromagnetic Interference (EMI) testing is presented.
Document ID
20180002620
Acquisition Source
Johnson Space Center
Document Type
Presentation
Authors
Davies, Francis
(NASA Johnson Space Center Houston, TX, United States)
Date Acquired
April 27, 2018
Publication Date
March 20, 2018
Subject Category
Electronics And Electrical Engineering
Ground Support Systems And Facilities (Space)
Report/Patent Number
JSC-E-DAA-TN53169
Meeting Information
Meeting: IAPG ESWG Interagency Advance Power Group Electrical Systems Working Group Meeting
Location: Dayton, OH
Country: United States
Start Date: March 20, 2018
End Date: March 22, 2018
Sponsors: Interagency Advanced Power Group
Funding Number(s)
WBS: WBS 401769.06.03.01.02
Distribution Limits
Public
Copyright
Public Use Permitted.
No Preview Available