NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Labor Estimation and Trending in an Operations EnvironmentAccurate cost estimation for future work is important for ensuring that organizations have the personnel and resources needed to complete a task successfully. Operations support in particular provides additional challenges for estimating cost. Unlike manufacturing-based work, it may be difficult to derive a "cost per product," and projects that appear to be similar may have drastically different underlying assumptions. In addition, for critical operations, a certain level of adaptability to changing circumstances is expected. Responding to contingencies or anomalies requires additional support and troubleshooting, and could result in increases to project cost. Labor estimation is one of the most important inputs for estimating the cost of an operations-based project, especially in a pre-established facility. Various methods are needed to develop reliable estimates. These methods include a bottom-up summarization of known or expected work items, and a top-down estimate generated by trending and scaling actual labor from past analogous operations support.
Document ID
20190005007
Acquisition Source
Goddard Space Flight Center
Document Type
Presentation
Authors
Laing, Jason
(Omitron, Inc. Greenbelt, MD, United States)
Date Acquired
May 6, 2019
Publication Date
May 6, 2019
Subject Category
Administration And Management
Report/Patent Number
GSFC-E-DAA-TN67706
Meeting Information
Meeting: Improving Space Operations Workshop 2019
Location: Santa Clara, CA
Country: United States
Start Date: May 2, 2019
End Date: May 3, 2019
Sponsors: American Institute of Aeronautics and Astronautics (AIAA), SpaceOps
Funding Number(s)
CONTRACT_GRANT: NNG14VC09C
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Professional Review
No Preview Available