NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Advanced Gas Turbine (AGT) Technology ProjectEngine testing, ceramic component fabrication and evaluation, component performance rig testing, and analytical studies comprised AGT 100 activities during the 1985 year. Ten experimental assemblies (builds) were evaluated using two engines. Accrued operating time was 120 hr of burning and 170 hr total, bringing cumulative total operating time to 395 hr, all devoid of major failures. Tests identified the generator seals as the primary working fluid leakage sources. Power transfer clutch operation was demonstrated. An alpha SiC gasifier rotor engine test resulted in blade tip failures. Recurring case vibration and shaft whip have limited gasifier shaft speeds to 84%. Ceramic components successfully engine tested now include the SiC scroll assembly, Si3N3 turbine rotor, combustor assembly, regenerator disk bulkhead, turbine vanes, piston rings, and couplings. A compressor shroud design change to reduce heat recirculation back to the inlet was executed. Ceramic components activity continues to focus on the development of state-of-the-art material strength characteristics in full-scale engine hardware. Fiber reinforced glass-ceramic composite turbine (inner) backplates were fabricated by Corning Glass Works. The BMAS/III material performed well in engine testing. Backplates of MAS material have not been engine tested.
Document ID
19870002562
Acquisition Source
Legacy CDMS
Document Type
Contractor Report (CR)
Date Acquired
September 5, 2013
Publication Date
September 1, 1986
Subject Category
Mechanical Engineering
Report/Patent Number
EDR-12344
NAS 1.26:179484
NASA-CR-179484
DOE/NASA/0168-10
Accession Number
87N11995
Funding Number(s)
CONTRACT_GRANT: DEN3-168
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available