NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Estimating the Life Cycle Cost of Space SystemsA space system's Life Cycle Cost (LCC) includes design and development, launch and emplacement, and operations and maintenance. Each of these cost factors is usually estimated separately. NASA uses three different parametric models for the design and development cost of crewed space systems; the commercial PRICE-H space hardware cost model, the NASA-Air Force Cost Model (NAFCOM), and the Advanced Missions Cost Model (AMCM). System mass is an important parameter in all three models. System mass also determines the launch and emplacement cost, which directly depends on the cost per kilogram to launch mass to Low Earth Orbit (LEO). The launch and emplacement cost is the cost to launch to LEO the system itself and also the rockets, propellant, and lander needed to emplace it. The ratio of the total launch mass to payload mass depends on the mission scenario and destination. The operations and maintenance costs include any material and spares provided, the ground control crew, and sustaining engineering. The Mission Operations Cost Model (MOCM) estimates these costs as a percentage of the system development cost per year.
Document ID
20160001190
Acquisition Source
Ames Research Center
Document Type
Conference Paper
Authors
Jones, Harry W.
(NASA Ames Research Center Moffett Field, CA United States)
Date Acquired
January 27, 2016
Publication Date
July 12, 2015
Subject Category
Economics And Cost Analysis
Spacecraft Design, Testing And Performance
Report/Patent Number
ARC-E-DAA-TN24212
ICES-2015-041
Meeting Information
Meeting: International Conference on Environmental Systems
Location: Bellevue, WA
Country: United States
Start Date: July 12, 2015
End Date: July 16, 2015
Sponsors: Texas Tech Univ.
Funding Number(s)
WBS: WBS 387873.04.99.99.99.99.21
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
Keywords
Life cycle cost
cost
space systems cost
No Preview Available