NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Constraint monitoring in TOSCAThe Job-Shop Scheduling Problem (JSSP) deals with the allocation of resources over time to factory operations. Allocations are subject to various constraints (e.g., production precedence relationships, factory capacity constraints, and limits on the allowable number of machine setups) which must be satisfied for a schedule to be valid. The identification of constraint violations and the monitoring of constraint threats plays a vital role in schedule generation in terms of the following: (1) directing the scheduling process; and (2) informing scheduling decisions. This paper describes a general mechanism for identifying constraint violations and monitoring threats to the satisfaction of constraints throughout schedule generation.
Document ID
19930009504
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Beck, Howard
(Edinburgh Univ.)
Date Acquired
September 6, 2013
Publication Date
May 1, 1992
Publication Information
Publication: NASA. Ames Research Center, Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
Subject Category
Cybernetics
Accession Number
93N18693
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available