NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Back to Results
Scheduling with partial orders and a causal modelIn an ongoing project at Honeywell SRC, we are constructing a prototype scheduling system for a NASA domain using the 'Time Map Manager' (TMM). The TMM representations are flexible enough to permit the representation of precedence constraints, metric constraints between activities, and constraints relative to a variety of references (e.g., Mission Elapsed Time vs. Mission Day). The TMM also supports a simple form of causal reasoning (projection), dynamic database updates, and monitoring specified database properties as changes occur over time. The greatest apparent advantage to using the TMM is the flexibility added to the scheduling process: schedules are constructed by a process of 'iterative refinement,' in which scheduling decisions correspond to constraining an activity either with respect to another activity or with respect to one time line. The schedule becomes more detailed as activities and constraints are added. Undoing a scheduling decision means removing a constraint, not removing an activity from a specified place on the time line. For example, we can move an activity around on the time line by deleting constraints and adding new ones.
Document ID
19930022941
Acquisition Source
Legacy CDMS
Document Type
Conference Paper
Authors
Boddy, Mark
(Honeywell, Inc. Minneapolis, MN, United States)
Carciofini, Jim
(Honeywell, Inc. Minneapolis, MN, United States)
Hadden, George D.
(Honeywell, Inc. Minneapolis, MN, United States)
Date Acquired
September 6, 2013
Publication Date
February 1, 1993
Publication Information
Publication: NASA. Lyndon B. Johnson Space Center, The Sixth Annual Workshop on Space Operations Applications and Research (SOAR 1992)
Subject Category
Administration And Management
Accession Number
93N32130
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available