NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
Workmanship Challenges for NASA Mission HardwareThis slide presentation reviews several challenges in workmanship for NASA mission hardware development. Several standards for NASA workmanship exist, that are required for all programs, projects, contracts and subcontracts. These Standards contain our best known methods for avoiding past assembly problems and defects. These best practices may not be available if suppliers are used who are not compliant with them. Compliance includes having certified operators and inspectors. Some examples of problems that have occured from the lack of requirements flow-down to contractors are reviewed. The presentation contains a detailed example of the challenge in regards to The Packaging "Design" Dilemma.
Document ID
20100028399
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Plante, Jeannette
(NASA Goddard Space Flight Center Greenbelt, MD, United States)
Date Acquired
August 24, 2013
Publication Date
June 23, 2010
Subject Category
Quality Assurance And Reliability
Meeting Information
Meeting: NEPP ETW Confernce
Country: United States
Start Date: June 23, 2010
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available