Aerial Refueling Process Rescheduling Under Job Related DisruptionsThe Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.
Document ID
20110012102
Acquisition Source
Langley Research Center
Document Type
Conference Paper
Authors
Kaplan, Sezgin
(Old Dominion Univ. Norfolk, VA, United States)
Rabadi, Ghaith
(Old Dominion Univ. Norfolk, VA, United States)
Date Acquired
August 25, 2013
Publication Date
March 1, 2011
Publication Information
Publication: Selected Papers and Presentations Presented at MODSIM World 2010 Conference and Expo
Subject Category
Systems Analysis And Operations Research
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available