Assembling and Testing NASA’s Space Launch System for First FlightNASA is planning its next step toward human expansion into the solar system. The Space Launch System (SLS) (Figure 1) is a critical enabling component of that expansion. SLS payloads for its early missions include the Orion crew vehicle and components for Gateway, a lunar outpost orbiting the Moon that will facilitate research, technology and partnerships for eventual Mars missions. All major core stage hardware for test and flight completed structural manufacturing in 2018. The major components for the first flight vehicle are complete or approaching completion of internal equipment installation. The core stage forward join operation is also complete. The 10 booster segments needed for first flight have been cast and are ready to ship to NASA’s Kennedy Space Center (KSC) for mating and stacking. The four RS-25 core stage engines completed processing at NASA’s Stennis Space Center (SSC) and are ready for core stage integration. The Orion Stage Adapter (OSA) joined the Interim Cryogenic Propulsion Stage (ICPS) at KSC to await the rest of SLS flight hardware. Production and preparation of hardware for the second mission is also underway. Looking ahead to a busy 2019, liquid oxygen (LOX) tank, liquid hydrogen (LH2) tank and intertank structural testing will take place. This paper will discuss the current and planned status of SLS development in context of NASA’s overall exploration plans.
Document ID
20190027422
Acquisition Source
Marshall Space Flight Center
Document Type
Conference Paper
Authors
Askin, Bruce R.
(NASA Marshall Space Flight Center Huntsville, AL, United States)
Date Acquired
July 17, 2019
Publication Date
June 3, 2019
Subject Category
Spacecraft Propulsion And Power
Launch Vehicles And Launch Operations
Report/Patent Number
M19-7361
Report Number: M19-7361
Meeting Information
Meeting: Propulsion Systems Hazards Subcommittee (PSHS)
Location: Dayton, OH
Country: United States
Start Date: June 3, 2019
End Date: June 7, 2019
Sponsors: Department of the Air Force, NASA Headquarters, Department of the Navy, Department of the Army
Funding Number(s)
CONTRACT_GRANT: NNM07AA70C
Distribution Limits
Public
Copyright
Work of the US Gov. Public Use Permitted.
No Preview Available