Analysis of the cost, schedule, and risk for Lynx mirror assembly productionThis paper analyzes a recently published model for Lynx Mirror Assembly production duration, to understand the sensitivity of duration to various factors. The factors considered are finite process yield, knowledge of the individual process times and finite server reliability. In all of these cases, closed form estimates are given along with numerical examples. This initial analysis indicates that accurate and precise knowledge of the process times is fundamental to making an accurate prediction of schedule duration. Analysis of the failure of any given server is also explained and can be used as the basis of a rational sparing policy.
Document ID
20210013347
Acquisition Source
Goddard Space Flight Center
Document Type
Conference Paper
Authors
Jonathan W. Arenberg
(Northrop Grumman (United States) Falls Church, Virginia, United States)
William W. Zhang
(Goddard Space Flight Center Greenbelt, Maryland, United States)
Date Acquired
April 7, 2021
Subject Category
Quality Assurance And Reliability
Optics
Meeting Information
Meeting: SPIE Optical Engineering + Applications 2019
Location: San Diego CA
Country: US
Start Date: September 15, 2019
End Date: September 19, 2019
Sponsors: SPIE Europe
Funding Number(s)
WBS: 399131
Distribution Limits
Public
Copyright
Portions of document may include copyright protected material.
Technical Review
External Peer Committee
No Preview Available