NASA Logo

NTRS

NTRS - NASA Technical Reports Server

Press Enter or click the Search button to begin your search.

Back to Results
xEMU Integrated Communication SystemFor the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center (JSC) has focused on development and testing of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and detailed design of the xEMU Integrated Communication System (ICS). This paper outlines the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates to the ICS are also provided, along with a forward strategy for final maturation into a flight-ready design.
Document ID
20220009210
Acquisition Source
Johnson Space Center
Document Type
Presentation
Authors
Ian Meginnis
(Johnson Space Center Houston, Texas, United States)
Bill Foster
(Jacobs (United States) Dallas, Texas, United States)
Date Acquired
June 10, 2022
Subject Category
Space Communications, Spacecraft Communications, Command And Tracking
Meeting Information
Meeting: International Conference for Environmental Systems (ICES)
Location: St. Paul, MN
Country: US
Start Date: July 10, 2022
End Date: July 14, 2022
Sponsors: International Conference on Environmental Systems (ICES)
Funding Number(s)
PROJECT: 02226
Distribution Limits
Public
Copyright
Public Use Permitted.
Technical Review
Single Expert
No Preview Available